This project is located in Noble County on US 6 in Brimfield, IN. The project was a road and bridge over CSX rail tracks relocate project. The new bridge was build next to the old to allow traffic to flow unaffected. The paving was completed with the use of ready mix concrete trucks to deliver the 5000 yards at 120 yards per hour.
Loading…
No Records Found
Sorry, no records were found. Please adjust your search criteria and try again.
Maps failed to load
Sorry, unable to load the Maps API.
5000
2018