The Peace United Methodist Church parking lot was originally specified in asphalt. The concrete contractor discussed the benefits of a concrete parking lot over an asphalt parking lot, including low cost maintenance, sustainability, cost effectiveness, and longevity. Based on these factors, the church decided on a concrete parking lot.
The concrete contractor used a binary 4500 psi concrete mix placed at a 4 inch slump to complete the project. The total amount of concrete placed was 297 yards. The concrete was placed using a 3D laser screed making operations run smoothly and timely. The project was completed in one day, including prep and set up. Efficiency of the contractor was most important as there was a specific time frame for completion of the project. Once completed, the church was another satisfied customer using concrete as the preferred pavement.